facebook tsunami japan





To prevent the tsunami from going into it, the tide embankment of 3m or 6m is constructed in the fishing port in Japan.
When the tsunami advisory is announced by the Meteorological Agency, the partition of the tide embankment is shut.
The tide embankment cannot correspond to the tsunami of height outside assumption because it is designed based on the record of past tsunami damage.

No comments:

Post a Comment